DFW Airport Plaza Foundation Installations

CA Rios Group has completed and continues to perform reinforced concrete plaza foundation installations throughout Dallas Fort Worth International Airport as part of major airport infrastructure improvement projects.

Dallas Fort Worth International AirportClient

Dallas/Fort Worth, TexasLocation

2022–2026Date

In ProgressStatus

Project overview

Concrete Plaza Foundation Installations

CA Rios Group has completed and continues to perform reinforced concrete plaza foundation installations throughout Dallas Fort Worth International Airport as part of major airport infrastructure improvement projects. Work has included multiple plaza foundation installations associated with the 17R-35L runway improvements from 2022–2024 and the ongoing West Duct Bank Optimization project beginning in 2026. The scope includes reinforced concrete foundations for airport electrical and lighting infrastructure while working under strict airport safety, operational, and scheduling requirements.

Key highlights

What made this job.

01

Reinforced Concrete Foundations

Multiple plaza foundation installations with excavation, formwork, reinforcing steel placement, anchor bolt layouts, and commercial concrete placement for airport infrastructure.

02

Airport Safety & Scheduling

All work performed under strict DFW Airport safety protocols, operational requirements, and scheduling constraints to minimize disruption to active airport operations.

03

Multi-Phase Infrastructure Work

Ongoing work spanning multiple project phases including the 17R-35L runway project and the West Duct Bank Optimization project, demonstrating long-term trust from DFW Airport.

Scope of work

Step by step, to spec.

01

Excavation & Foundation PreparationSite excavation, subgrade preparation, and grading to establish precise foundation locations for plaza electrical and lighting infrastructure.

02

Anchor Bolt Layout & Conduit CoordinationPrecise anchor bolt layout and conduit coordination to meet airport electrical infrastructure specifications and ensure accurate placement for above-grade equipment.

03

Reinforcing Steel & FormworkHeavy reinforcing steel placement and formwork construction to meet structural requirements for commercial plaza foundations.

04

Concrete Placement & Finish WorkCommercial concrete placement and professional finish work completed under strict airport scheduling and safety requirements across multiple project phases.